- Release the legs and raise the platform of the tripod up to chest height and re-lock the legs.
|
- Open the legs of the tripod in an equilateral triangle,
placing the feet about 3 feet apart with the desired point in
the center. (On sloped ground
put two of the legs downhill, and one of the legs poking
into the hill.)
|

Low Res
High Res
|
- Set the Total Station on the platform and tighten the screw that holds it in place from the bottom.
|

Low Res
High Res
|
- Turn on the Total Station and use the plummet device (in our case a laser plummet) by pressing the following
keys: power, menu, F4, F3, F1.
|

Low Res
High Res

Low Res
High Res
|
- Step one of the legs into the ground, and then take a hold of the other two legs and reposition them until
the laser is directly on the desired point,
then step the other two legs into the ground.
(For sloped ground step the uphill leg into the ground
and adjust the two downhill legs.)
|

Low Res
High Res
|
- Now as needed release any one of the legs at a time and adjust its length until the bubble of the rough or
circle bubble is in the center of the circle.
|

Low Res
High Res
|
- After loosening the horizontal motion clamp turn
the Total Station so that the plate level is parallel with two of
the leveling screws.
Now adjust the two screws so
that the bubble is in the center of the plate.
|

Low Res
High Res
|
- Now turn the Total Station 90° so that the plate level is
perpendicular to the first two screws using the third screw. 
Using only that third screw adjust so that the
bubble is once again centered.
|

Low Res
High Res
|
- (Avoid the temptation to over-use the leveling screws. 
If you need to turn them more than one full
turn you did a sloppy job on step six and you should repeat
it.)
|
- Now check your leveling by turning the Total Station to a
random angle and check the plate level. 
If needed repeat steps 7, and 8.
|
- Once again turn on the laser plummet and check
your position again. If needed loosen the screw holding the
Total Station to the platform and slide the Total
Station over the point, and re tighten the
screw.
|
- Double check your leveling and you’re ready to go!
|